In view of the limited fossil fuel availability with the country, the relevance of Nuclear Power in meeting the short and long term needs of our energy was recognised right at the initial stage. From the very beginning, as a long term strategy, the Nuclear Power Programme formulated by Dr. Homi Bhabha embarked on the three stage nuclear power programme, linking the fuel cycle of Pressurised Heavy Water Reactor (PHWR) and Fast Breeder Reactor (FBR) for Judicious utilisation of our limited reserves of Uranium and vast Thorium reserves. The emphasis of the programme was self-reliance and thorium utilisation as a long term objective. The PHWR was chosen due to extensive research and development facilities covering diverse areas for supporting technology absorption.
The 3-stage of our Nuclear Power Programme are :
* Stage-I : envisages, construction of Natural Uranium, Heavy Water Moderated and Cooled Pressurised Heavy Water Reactors (PHWRs). Spent fuel from these reactors is reprocessed to obtain Plutonium.* Stage-II : evisages, construction of Fast Breeder Reactors (FBRs) fuelled by Plutonium produced in stage-I. These reactors would also breed U-233 from Thorium.* Stage-III : would comprise power reactors using U-233 / Thorium as fuel.
India's available energy resources - Identified Energy Reserves*:
Coal - 186 billion tonnesLignite - 5,060 million tonnesCrude Oil - 728 million tonnesNatural Gas - 686 billion Cu-mUranium - 78,000 tonnesThorium - 3,63,000 tonnesHydro - 84,000 MW at 60 % PLF
RenewablesBiomass - 6000 MWeWind, Solar etc. - 20,000 MWe
*According to figures released by the Government of India
Monitoring of environment surrounding a Nuclear Plant
This is done by the Environmental Survey Laboratory (ESL) set up well before starting the operation of the plant. The ESL collects data on forest, flora and fauna, marine products, food and air etc., to set up base level data on their quality prior to commencement of the operation of the plant. Samples are drawn and regularly analysed to ascertain the status on a continuos basis. The ESL functions independent of plant authorities and the data collected is checked by the regulatory authorities for control purposes.
In view of the limited fossil fuel availability with the country, the relevance of Nuclear Power in meeting the short and long term needs of our energy was recognised right at the initial stage. From the very beginning, as a long term strategy, the Nuclear Power Programme formulated by Dr. Homi Bhabha embarked on the three stage nuclear power programme, linking the fuel cycle of Pressurised Heavy Water Reactor (PHWR) and Fast Breeder Reactor (FBR) for Judicious utilisation of our limited reserves of Uranium and vast Thorium reserves. The emphasis of the programme was self-reliance and thorium utilisation as a long term objective. The PHWR was chosen due to extensive research and development facilities covering diverse areas for supporting technology absorption.
The 3-stage of our Nuclear Power Programme are :
* Stage-I : envisages, construction of Natural Uranium, Heavy Water Moderated and Cooled Pressurised Heavy Water Reactors (PHWRs). Spent fuel from these reactors is reprocessed to obtain Plutonium.
* Stage-II : evisages, construction of Fast Breeder Reactors (FBRs) fuelled by Plutonium produced in stage-I. These reactors would also breed U-233 from Thorium.
* Stage-III : would comprise power reactors using U-233 / Thorium as fuel.
India's available energy resources - Identified Energy Reserves*:
Coal - 186 billion tonnes
Lignite - 5,060 million tonnes
Crude Oil - 728 million tonnes
Natural Gas - 686 billion Cu-m
Uranium - 78,000 tonnes
Thorium - 3,63,000 tonnes
Hydro - 84,000 MW at 60 % PLF
Renewables
Biomass - 6000 MWe
Wind, Solar etc. - 20,000 MWe
*According to figures released by the Government of India
Monitoring of environment surrounding a Nuclear Plant
This is done by the Environmental Survey Laboratory (ESL) set up well before starting the operation of the plant. The ESL collects data on forest, flora and fauna, marine products, food and air etc., to set up base level data on their quality prior to commencement of the operation of the plant. Samples are drawn and regularly analysed to ascertain the status on a continuos basis. The ESL functions independent of plant authorities and the data collected is checked by the regulatory authorities for control purposes.